Supporting Koya University's Green University initiative, this project showcases Progress Sun's role in delivering comprehensive EPC services. A large array of high-efficiency solar panels is being installed across rooftops, building facades and car parking structures of the Presidency building, helping transition the campus toward clean, renewable energy and reinforcing its commitment to sustainability.

Project Facts

  • Customer:Koya University
  • Location:Koya, Iraq
  • Category:EPC (Engineering, Procurement and Construction)
  • Function:EPC Contractor

Scope of Work

  • System design and engineering
  • Procurement of high-efficiency solar panels and components
  • Installation on rooftops, walls and parking structures
  • Electrical integration and grid connection
  • Testing and commissioning

Our Solution

Progress Sun is delivering a full EPC solution aligned with the university's sustainability goals. The work combines engineering, procurement, multi-surface installation and electrical integration so the campus can use clean energy across key facilities.

The Result

Through this project, Progress Sun is enabling Koya University to reduce its carbon footprint, lower energy costs and take a significant step toward long-term environmental responsibility as part of its Green University direction.

Planning a campus or institutional solar project?

Progress Sun can support feasibility, EPC delivery, grid connection, testing and commissioning for rooftop, facade and carport PV systems.